The roofing
The finished roofing, installed to the maker's nailing and fastening pattern from the eaves up to the peak.
A roofer in Maplewood can install a new roof in the proper sequence: drip edge, ice and water shield, underlayment, starter strip, flashing, vents and then the roofing itself, because the details at edges, walls and valleys decide whether it leaks. One call to (973) 858-1830 reaches a nearby roofing contractor.
Most early roof leaks are installation problems, not material problems. High nailing lets wind peel shingles off, a skipped kickout flashing sends water down into the wall and a poorly cut valley lets water work sideways under the shingles. None of these are visible from the ground once the job is done.
Choosing the material comes first. Dimensional shingles cover most houses, though metal, tile and synthetic products are growing, and each one installs differently. Roof pitch matters too, since standard shingles need enough slope to shed water and very low pitches call for a membrane instead.
Have some basics ready when you call. Say whether the job is a tear-off, an addition or new construction, and whether you have a material or color picked out.
If the problem goes deeper than it first looked, a Maplewood roofer may also recommend roof replacement or shingle roof installation.
Looking for Maplewood roof installation? Call (973) 858-1830 and describe the problem to a roofer who works in Maplewood.
Call nowA roof goes on from the bottom of the system to the top.
The roof deck must be clean, dry and solid, with any soft plywood or OSB replaced and loose boards renailed. Nails cannot hold in soft wood, so this step is never skipped.
Drip edge goes on at the eaves, ice and water shield is rolled out along the eaves and in the valleys, and drip edge is then added along the rakes over the underlayment. That layering lets water drain off the metal instead of behind it.
Synthetic underlayment or felt covers the rest of the deck, lapped so each row sheds over the one below. Synthetic is lighter, tears less and stays put better than felt if it rains mid-job.
Flashing goes in as the roofing goes up: step pieces at walls, a kickout at the bottom edge and boots on every pipe. Sealant is a backup, not the flashing itself.
A starter strip goes along the eaves and rakes, then shingles are laid in straight courses and nailed in the reinforced nail zone, with four or six nails each as the maker specifies. In cold weather, shingles may need hand sealing because the sealant strips will not bond until warm sun hits them.
Exhaust vents go in near the peak and the ridge is capped. Without enough soffit intake, a ridge vent cannot do its job.
The finished roofing, installed to the maker's nailing and fastening pattern from the eaves up to the peak.
Ice and water shield at the eaves and valleys, with underlayment over the rest of the deck acts as the second layer of protection.
Ridge vents or other exhaust paired with soffit intake which protects the roofing and the decking.
Drip edge at the eaves and rakes finishes the edges cleanly.
Step, counter and kickout flashing plus new pipe boots so the weak points match the new roof.
A new roof installation can mean a roof on a stripped house, a roof on new framing or a roof on an addition tied into an existing one. Tie-ins between new and old roofs are a common leak point, so they need full ice barrier and careful flashing. Ask whether the new section will match the existing roofing or whether the whole roof should be redone.
Every roofing product comes with instructions that set the nail count, nail placement, minimum slope and vent requirements. Good questions for a Maplewood roofing contractor include nail count, underlayment type and the ventilation plan. Vague answers about the hidden layers are worth noticing.
With an overlay, sometimes called a layover or recover, the new roofing goes on top of the existing shingles. Building codes generally cap asphalt roofs at two layers, so an overlay is only possible on a roof with a single layer, and not over shingles that are badly curled, wet or sitting on soft decking. The appeal is less labor, less debris and a shorter job.
The trade-offs are real. Hidden rot stays hidden, flashing is often reused and the roof carries the weight of two layers. If an overlay is on the table, ask the roofer to confirm the layer count, replace the drip edge and flashing and explain what happens at the next replacement, when both layers must come off.
Around Maplewood, roof installation work covers older houses getting their second or third roof and newer homes adding on. From Maplewood out to neighboring communities such as Vauxhall, Union, Springfield and Short Hills, roofers see plank decks and thin attic vents on older houses and complex rooflines with many valleys on newer ones, so it is worth asking how each detail will be handled before the first bundle is opened.
Need roof installation around Maplewood? Call (973) 858-1830 for a Maplewood roofer who serves the towns around it too.
Winters here are long and cold, with snow on the roof for weeks at a time and plenty of nights below freezing. When warm attic air melts the snow, the meltwater runs down and freezes again at the eaves, building ice dams that push water up under the shingles. Coastal storms and heavy spring rain drive water sideways into flashing, valleys and old chimneys. Most homeowners in Maplewood, NJ have the roof checked in the fall and again after the snow melts.
Small roof problems caught early usually stay small repairs.
Local roofers see the same roofs and storm damage across Maplewood and nearby towns.
Ask the roofer about the cause, the options and the estimate before work starts.
More questions? Call (973) 858-1830
Full tear-off and replacement for roofs that are worn out, storm beaten or leaking in several places, so the house is dry for decades instead of seasons.
Learn moreChoosing the right shingle and installing every layer under it, from drip edge to ridge cap, for new homes, additions and reroofs.
Learn moreMetal roof installation built around the right panel, finish and trim for the house, with high-temperature underlayment and proper flashing.
Learn moreGetting new framing dried in fast and roofed to code, with flashing timed around windows and siding.
Learn moreLooking for something else?